By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Next India Magazine
  • Home
    • Home 2
    • Home 3Hot
    • Home 4
    • Home 5New
  • Home
  • Opinion

    That Provide Critical Analysis on Political Decision-Making

    krutikadalvibiz@gmail.com

    Analyzing Global Dynamics and Unraveling Key Policy Initiatives

    krutikadalvibiz@gmail.com

    Luxurious Stays Redefining Hospitality at Hotel Havens

    krutikadalvibiz@gmail.com

    Electric Cars Subsidies by German Taxpayers End Up on Foreign Roads

    krutikadalvibiz@gmail.com

    Challenge and Inspire Future of Political Thought

    krutikadalvibiz@gmail.com

    Assessing the Diplomatic Challenges and Global Security

    krutikadalvibiz@gmail.com
  • World
  • Politics
  • Market
  • Health
  • Insurance
  • Pages
    • Blog Index
    • Contact US
    • Search Page
    • 404 Page
    • Technology
    • World
  • Pages
    • Blog Index
    • Search Page
    • 404 Page
  • Technology
    TechnologyShow More
    Dr. Nishant Sawant: The Mind Behind Secure Digital Progress
    4 Min Read
    NASA’s Artemis II Mission Rekindles Humanity’s Dream of Deep Space Exploration
    5 Min Read
    Buying a Car Will Soon be Like Buying a Phone, Why Your Next Car Could be an EV
    Hands-On With the iPhone 13, Pro, Max, and Mini
    4 Min Read
    Explained: What are Smart Glasses and How Do It Work?
    4 Min Read
  • Posts
    • Post Layouts
      • Standard 1
      • Standard 2
      • Standard 3
      • Standard 4
      • Standard 5
      • Standard 6
      • Standard 7
      • No Featured
    • Gallery Layouts
      • Layout 1
      • Layout 2
      • layout 3
    • Video Layouts
      • Layout 1
      • Layout 2
      • Layout 3
      • Layout 4
    • Audio Layouts
      • Layout 1
      • Layout 2
    • Post Sidebar
      • Right Sidebar
      • Left Sidebar
    • Review
      • Stars
      • Scores
      • User Rating
    • Content Features
      • Highlight Shares
      • Inline Mailchimp
      • Print Post
      • Inline Related
      • Source/Via Tag
      • Reading Indicator
      • Content Size Resizer
    • Table of Contents
      • Full Width
      • Left Side
    • Sponsored Post
  • Contact
  • Pages
    • Search Page
    • 404 Page
Reading: Delhi Road Strengthening Project: Rs 657 Crore Plan To Fix 270km Of City Roads By October 2026
SUBSCRIBE
Next India MagazineNext India Magazine
Font ResizerAa
  • My Saves
  • Economics
  • Technology
  • My Interests
  • World
  • My Feed
  • History
  • Business
  • Technology
  • Lifestyle
  • Fashion
  • Health
  • Technology
  • World
Search
  • Pages
    • Blog Index
    • Contact Us
    • Search Page
    • 404 Page
  • Home
    • Home 1
    • Home 2
    • Home 3
    • Home 4
    • Home 5
  • Home
  • Blog
  • Categories
    • Technology
    • Lifestyle
  • Personalized
    • My Feed
    • My Saves
    • My Interests
    • History
  • Demos
  • Categories
    • Technology
    • Business
    • Fashion
    • Economics
  • Bookmarks
  • Categories
    • Technology
    • Health
    • World
  • More Foxiz
    • Blog Index
    • Sitemap
  • Bookmarks
  • Contact
  • More Foxiz
    • Sitemap
Have an existing account? Sign In
Follow US
  • Home
  • World
  • Contact
  • Blog
© Foxiz News Network. Ruby Design Company. All Rights Reserved.
World

Delhi Road Strengthening Project: Rs 657 Crore Plan To Fix 270km Of City Roads By October 2026

India Times Now
Last updated: June 25, 2026 3:35 pm
India Times Now
7 Min Read
Share
SHARE

Contents
Delhi road project to cover three major zonesWhat will change in road constructionComposite tender system and five-year accountabilityQuality audit and pollution safeguards

New Delhi

-Ashish Rana

Time
Updated: Thursday, June 25, 2026, 20:42 [IST]

Delhi has cleared a Rs 657.99 crore road strengthening project aimed at fixing more than 270 km of key stretches across the capital, after repeated complaints about broken roads, potholes and short-lived repairs. The project was approved by the Expenditure Finance Committee chaired by Chief Minister Rekha Gupta.

Road construction work for Delhi infrastructure improvement project

Delhi’s Expenditure Finance Committee approved a Rs 657.99 crore project to strengthen over 270 km of roads across East, North, and South Delhi by October, focusing on durable construction, improved signage, drainage, and a five-year contractor defect liability period.

The Public Works Department will carry out the work across East, North and South Delhi, with the government setting an October deadline for completion. Officials have described the plan as more than routine resurfacing, saying it will focus on stronger road layers, better lane markings, improved signage and drainage upgrades.

Delhi road project to cover three major zones

The approved plan divides the work into three zones. South Delhi will see the largest share, with 107.92 km of roads to be strengthened at an estimated cost of Rs 263.61 crore. North Delhi will get work on 104.42 km of roads, for which Rs 247.31 crore has been earmarked.

East Delhi will account for 58.29 km of the road network under the project, with an estimated allocation of Rs 147.08 crore. Together, the three packages cover more than 270 km of roads that fall under the Public Works Department’s responsibility.

Public Works Department Minister Parvesh Sahib Singh and senior officials attended the EFC meeting where the project was cleared. The approval comes at a time when road quality has become a visible civic issue in Delhi, especially during and after the monsoon months, when damaged surfaces and waterlogging often worsen traffic conditions.

What will change in road construction

The government says the project will use a more durable method than patchwork repairs. The damaged top layer of existing roads will first be removed with machines. A fresh, stronger surface will then be laid to improve the road’s life and reduce repeated repairs on the same stretches.

This approach is significant for Delhi because many busy roads suffer from recurring surface failure. Heavy traffic, utility cuts, poor drainage and water seepage often reduce the life of resurfaced roads. Without improving the underlying surface and drainage, potholes tend to return quickly after temporary repairs.

The project also includes new lane markings, modern signboards and drainage improvements. These additions matter because road safety does not depend only on a smooth surface. Clear markings, visible signs and proper runoff channels can reduce confusion, prevent water accumulation and make traffic movement more predictable.

Composite tender system and five-year accountability

A key change is the tendering model. Instead of issuing separate tenders for individual roads, the government will use a zone-wise composite tender system for the first time in this project. Each selected agency will be responsible for an entire zone, rather than isolated stretches.

The government expects this to improve coordination, monitoring and accountability. In road projects, fragmented contracting often creates gaps in responsibility, especially when adjoining stretches are handled by different agencies. A composite package can make it easier to track delays, defects and maintenance responsibility across a wider area.

Contractors will also remain responsible for road quality under a five-year defect liability period. This means their role will not end after construction. If potholes or defects appear during the liability period, the contractor will have to repair them within the prescribed time.

The government has said pothole repairs will have to be ensured within 48 hours. The effectiveness of this provision will depend on monitoring, quick reporting and strict enforcement of contract conditions. For commuters, this is one of the most important parts of the project, as delayed repairs often turn small defects into larger traffic and safety problems.

Quality audit and pollution safeguards

To strengthen oversight, the project will include independent quality audits. Institutions such as CSIR-Central Road Research Institute and the School of Planning and Architecture will be involved in examining construction quality. External audits are intended to add technical scrutiny beyond routine departmental supervision.

Such checks can be useful in assessing material quality, road thickness, surface strength and drainage design. They can also help identify whether contractors are following project specifications. For a large public works programme, independent review is important because visible road failure often appears only after traffic load and weather exposure.

The government has also said construction activity will follow air quality norms laid down by the Commission for Air Quality Management. Dust control measures will be mandatory during work. This is important in Delhi, where construction dust is a major pollution concern and road work often overlaps with periods of poor air quality.

Dust suppression, proper handling of debris and controlled movement of construction material will be closely watched if the project is implemented during dry spells. The challenge for agencies will be to complete work quickly while keeping roads usable and limiting disruption for residents, traders and commuters.

The Rs 657.99 crore plan brings together resurfacing, road safety features, contractor liability, third-party audits and environmental safeguards. Its real test will be execution before the October deadline and whether the upgraded roads remain pothole-free beyond the first season of heavy traffic and rain.

TAGGED:270kmCityCroreDelhiFixOctoberPlanProjectRoadRoadsStrengthening
Share This Article
Facebook Email Copy Link Print
Previous Article American creator shares 5 things she finds ‘absolutely crazy’ about living in India: ‘Can’t learn your baby’s gender’
Next Article ‘Not okay with it’: Sunitha hits back at Chinmayi Sripaada after being called out for saying ‘his eyes, his wish’
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

You Might Also Like

World

Adani And IHC To Build Odisha Aluminium Ecosystem Worth USD 11.5 Billion

The Adani Group and UAE-based International Holding Company sign an…

5 Min Read
World

Cancer Horoscope for Today May 10, 2026, Sunday – Nurture Your Feelings And Find Comfort At Home

Lifestyle -Darshana Tiwari Published: Sunday, May 10, 2026, 0:00 Cancer…

4 Min Read
World

Will Gold & Silver Prices In India Become Costlier After Govt Hikes Import Tariffs?

India increases gold and silver import duties to 15%, expanding…

6 Min Read
World

Macron posts Hindi farewell video for Modi after France visit to Nice, Evian, and Paris

French President Emmanuel Macron posted a farewell video in Hindi…

5 Min Read
Next India MagazineNext India Magazine
Follow US
© 2026 Next India Magazine powered by India Times Now. All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?